Since the start, Bulkteknik AB has been really successful, with interesting projects and the pleasure of
welcoming new customers. At the moment, we are developing and constructing:
Finnsementti OY, Oulu, Finland
Cement terminal in Oulu harbor. Turnkey delivery.
Finnsementti OY, Oulu, Finland
Cement terminal in Oulu harbor. Turnkey delivery.
The project includes engineering, manufacturing, installation and start up for a complete cement terminal. The terminal handles intake of cement from ships, storing cement in 2 silos and filling bulk trucks with cement.
The terminal operates without personnel. Truck loading is operated by truck drivers.
The installation includes:
- Transport piping from quay to silos, capacity up to 400 tons/hour.
- Diverter for transport to two silos. Dedusting equipment.
- 2 silos 9 000 tons and 5 000 tons cement.
- Truck loading building.
- Truck scale. Control equipment for truck loading ordered amount of cement.
- Transport equipment, capacity 200 tons/hour for dust free truck loading from silos. The truck is placed on the truck scale and a screw conveyor with loading spouts is moved to the inlets in the truck tanks.
- Control equipment for the complete installation. Communication with the client's business system.
- Electric equipment and installation.
Installations starts June 1st and the terminal shall be in operation before January 2012.
Bioenergi Norr AB, Luleå
Turn key delivery of truck loading for wood pellets.
Bioenergi Norr AB, Luleå
Turn key delivery of truck loading for wood pellets.
The project includes engineering, manufacturing, installation and start up for a complete truck loading facilty.
The installation includes:
- Dumping pit 70 m3.
- Chain conveyors and bucket elevator for transport to silo. Capacity 120 tons/hour.
- Insulated silo 70 m3.
- Sieving equipment capacity 120 tons/hour.
- Truck scale. Control equipment for truck loading ordered amount of cement.
- Truck loading equipment. The truck is placed on a truck scale and a chain conveyor with loading spouts is moved to the inlets in the truck tanks.
- Control equipment for the complete installation. Communication with the client's business system.
- Electric equipment and installation.
Installations starts September and the terminal shall be in operation end of October 2011.
After delivery and launch, each project will be presented on this page, with all specifications. If you are interested to know
more right now, please contact us.

North Cape Minerals AS, AVD. Spone Norway
Turn-key delivery of plant for drying and screening of sand...
North Cape Minerals AS, AVD. Spone Norway
Turn-key delivery of plant for drying and screening of sand.
This project includes engineering, manufacturing, assembly and test run of equipment for the handling of sand material. The sand is transported with wheel loader from the pit to the feeder before dryer. The sand is separated into a number of fractions, from 0 to 4 mm, that are stored in silos. The different fractions will be dosed from the silos, controlled from the computer and transported to a truck loading station. It is also possible to transport the ready mixed sand to an existing storage.
The installation includes:
- Foundation for building, receiving station and conveyors
- Covered receiving hopper with belt feeder
- Steel building approx. 38 x 8.6 x 30 m. (LxWxH)
- Belt conveyors
- Dryer with filter
- Screw conveyors
- Sizers
- Bucket elevators
- Distribution equipment
- Aspiration systems including duct system
- Discharge to truck loading station with service platforms
- Gantries for belt conveyors
- Computerized control system and equipment
- Electric and instrumentation installations
Design and planning of the plant is initiated, test runs and completion of the project is scheduled to end of
2010/beginning of 2011.
Cementa AB, Slite
Equipment for handling of waste material from storage to dosing equipment before burner.
Cementa AB, Slite
Equipment for handling of waste material from storage to dosing equipment before burner.
The delivery includes engineering, manufacturing, assembly and test run of equipment specially designed for the specific needs and requirements within the handling of waste material. This means special consideration regarding dust explosion and fire.
The installation includes:
- Belt conveyors
- Aspiration systems
- Screw conveyors
- Magnet separator
- Chain conveyor
- Pneumatic conveyor
- Reconstruction of silos
Cementa AB, Skövde
Equipment for handling of waste material from storage to dosing equipment before burner.
Cementa AB, Skövde
Equipment for handling of waste material from storage to dosing equipment before burner.
The delivery includes engineering, manufacturing, assembly and test run of equipment specially designed for the specific needs and requirements within the handling of waste material. This means special consideration regarding dust explosion and fire.
The installation includes:
- Buffer storage with stoker feeder
- Chain conveyors
- Dosing screw conveyor
- Aspiration systems
- Magnet separator
- Roof over buffer storage
- Steel structure and cladding over dosing equipment
Cementa AB, Degerhamn
Equipment for handling of waste material from storage to dosing station before burners.
Cementa AB, Degerhamn
Equipment for handling of waste material from storage to dosing station before burners.
The installation includes:
- Chain conveyors
- Two way valve
- Steel structure and catwalks for conveyors and dosing equipment
Nordkalk, Köping
Receiving plant for quicklime with an overall capacity of...
Nordkalk, Köping
Receiving plant for quicklime with an overall capacity of 350ton/hour.
The delivery is a so called "turn-key" delivery with all activities such as engineering, fabrication, installation and commissioning
included of the following equipment:
- Receiving hopper, complete with fluidization & de-dusting system
- Belt conveyors
- Screw conveyors
- Bucket elevator
- Flat storage 4000m3
Bulkteknik Sweden AB is also responsible for all other subcontractors and
installations i.e electrical, instrumentation, etc..
Completion date: May 2009
Skånemöllan, Tågarp
Silo building for handling of processed grain...
Skånemöllan, Tågarp
Silo building for handling of processed grain
The building includes 30off rectangular silos with various volume and capacity. Bulkteknik Sweden AB is also responsible for equipment
procurement & installation of, ie bucket elevator and chain conveyors. The scoop of work also includes dimensioning and fabrication / assembly
of the entire building which consists of approx. 300ton steel.
Completion date: February/March 2010
Thomas Cement, Oxelösund
Convert and refurbish existing cement terminal to...
Thomas Cement, Oxelösund
Convert and refurbish existing cement terminal to instead handle flyash.
Existing terminal to be extended with a new load out line and complete change of existing transport, aspiration and de-dusting system.
The extension with one extra load out line also includes change of operating system to Bulkteknik Sweden AB's own developed system. This system is
controlled by the truck driver him self only, no stationary personnel is required. This allows for deliveries 24h per day and 265days per year! This
is of course a great advantage compared with more traditional terminals systems.
Completion date: February 2010
|